THE CHIRAJARA BRIDGE COLLAPSE

The Chirajara Bridge was part of the Bogotá–Villavicencio highway project in Colombia, designed to improve connectivity between the capital and the eastern plains.

It was conceived as a major engineering landmark: a long-span, cable-stayed structure crossing a deep ravine in a seismically active region.

The bridge was built to shorten journey times, improve transport links and support traffic between Bogotá and the Llanos region.

Project overview

THE CHIRAJARA BRIDGE COLLAPSE

Bhe Chirajara Bridge was part of the Bogotá–Villavicencio highway project in Colombia, designed to improve connectivity between the capital and the eastern plains.

It was conceived as a major engineering landmark: a long-span, cable-stayed structure crossing a deep ravine in a seismically active region.

The bridge was built to shorten journey times, improve transport links and support traffic between Bogotá and the Llanos region.

IMAGE LEFT TEXT RIGHT

Construction began as part of the Fourth Generation road infrastructure programme, which aimed to modernise Colombia’s transport network.

The Chirajara Bridge consisted of two independent carriageways, each supported by its own set of cable stays anchored to tall concrete pylons.

Its form followed a common modern design strategy for deep valleys, where cable-stayed systems provide an economical way of achieving long spans with minimal foundations in difficult terrain.

Inspection findings

IMAGE RIGHT TEXT LEFT START

Construction began as part of the Fourth Generation road infrastructure programme, which aimed to modernise Colombia’s transport network.

The Chirajara Bridge consisted of two independent carriageways, each supported by its own set of cable stays anchored to tall concrete pylons.

Its form followed a common modern design strategy for deep valleys, where cable-stayed systems provide an economical way of achieving long spans with minimal foundations in difficult terrain.

Inspection findings
“The failure highlighted the importance of examining the complete structural load path."

Project background

Subsequent investigations revealed that the failure stemmed from a design error involving the lower section of the tower, specifically the transverse (horizontal) ties connecting the legs of the pylon.

Subsequent investigations revealed that the failure stemmed from a design error involving the lower section of the tower, specifically the transverse (horizontal) ties connecting the legs of the pylon.

The design did not provide adequate capacity to resist the combination of axial, bending and shear forces induced during construction.

Cracking had already been observed in the week leading up to the collapse, but its significance was not fully recognised.

KEY IDEA
STRUCTURAL TERMINOLOGY
The loads then pass through the pylons and into the foundations.

Small image right

However, the project became internationally known after the dramatic collapse of one of its pylons on 15 January 2018, during construction. At the time of failure, the deck had not yet been fully connected, and only a portion of the structure was complete.

The collapse resulted in the tragic loss of nine workers and drew significant attention to construction practices, design verification processes and structural safety in large infrastructure projects.

The collapse resulted in the tragic loss of nine workers and drew significant attention to construction practices, design verification processes and structural safety in large infrastructure projects.

Project overview

TWO COLUMN LEFT

When one of the transverse diaphragms failed, the load was rapidly redistributed to adjacent members, which were also under-designed. This triggered a progressive collapse mechanism, ultimately causing the entire pylon to buckle and fall.

Independent engineering assessments concluded that the failure was not due to material defects, construction errors, or seismic activity, but rather to insufficient structural detailing and inadequate redundancy in the tower design.

As a result of the findings, the partially standing opposite tower was demolished as a precaution. PHOTO As a result of the findings, the partially standing opposite tower was demolished as a precaution. PHOTO As a result of the findings, the partially standing opposite tower was demolished as a precaution. PHOTO

TWO COLUMN RIGHT

The collapse highlighted the importance of robust peer review, especially for complex, non-standard structures in challenging environments.

As a result of the findings, the partially standing opposite tower was demolished as a precaution. PHOTO As a result of the findings, the partially standing opposite tower was demolished as a precaution. PHOTO As a result of the findings, the partially standing opposite tower was demolished as a precaution. PHOTO

As a result of the findings, the partially standing opposite tower was demolished as a precaution. PHOTO As a result of the findings, the partially standing opposite tower was demolished as a precaution. PHOTO As a result of the findings, the partially standing opposite tower was demolished as a precaution. PHOTO

TALL IMAGE RIGHT

A redesign was commissioned, led by a different engineering team, opting for a new viaduct structure rather than trying to replicate the original cable-stayed concept.

The redesigned bridge incorporated greater redundancy, improved detailing, and a more conservative approach to force distribution and seismic resilience.

The Chirajara Bridge collapse has since become a frequently cited case study in structural engineering.

It illustrates several critical lessons: the need for rigorous independent checking, the sensitivity of cable-stayed bridges during staged construction, and the risks associated with complex structures that lack redundancy.

It also demonstrates the importance of recognising and acting upon early warning signs, such as cracking or unusual structural movement.

General view of the Chirajara Bridge
General view of the Chirajara Bridge

TALL IMAGE LEFT

A redesign was commissioned, led by a different engineering team, opting for a new viaduct structure rather than trying to replicate the original cable-stayed concept.

The redesigned bridge incorporated greater redundancy, improved detailing, and a more conservative approach to force distribution and seismic resilience.

The Chirajara Bridge collapse has since become a frequently cited case study in structural engineering.

It illustrates several critical lessons: the need for rigorous independent checking, the sensitivity of cable-stayed bridges during staged construction, and the risks associated with complex structures that lack redundancy.

It also demonstrates the importance of recognising and acting upon early warning signs, such as cracking or unusual structural movement.

STRUCTURAL TERMINOLOGY
A cable-stayed bridge transfers deck loads through inclined cables into towers or pylons.

A cable-stayed bridge transfers deck loads through inclined cables into towers or pylons. A cable-stayed bridge transfers deck loads through inclined cables into towers or pylons. A cable-stayed bridge transfers deck loads through inclined cables into towers or pylons.

KEY IDEA
Force transfer
The loads then pass through the pylons and into the foundations.
LOAD PATH
Definition
The load path describes the route through which forces travel from the bridge deck, through the cables and pylons, and into the ground.

The load path describes the route through which forces travel from the bridge deck, through the cables and pylons, and into the ground.

The load path describes the route through which forces travel from the bridge deck, through the cables and pylons, and into the ground.
Wide view of the Chirajara Bridge site
“The failure highlighted the importance of examining the complete structural load path."
KEY IDEA
Force transfer
The loads then pass through the pylons and into the foundations.